Quote:
Originally Posted by Unregistered
Dunno this is which stat board MX scheme.
I think ministry scheme not on superscale should be
C = 1.5 base
C+ = 1.75
B = 2.25
B+ = 2.5
A = 3? (not sure)
|
ministry, MX scale (non-scholar).. got a B last year and PB was 2.5 months