Quote:
Originally Posted by Unregistered
This means something wrong with the project management if he/she everyday need to end work at 330am, no offense
Was in audit for the past 10 years, the latest time i knock off was 3am ( but only for critical time when printing AR/ rushing AC reporting)
Too bad the audit team who will be ex auditor as their client, they will get roast hard and the client know how to compute the basis of the materiality
|
are u from small firm?
u know we big 4 people/ex big 4 people don't mix with those right?
im ex big 4 and i work to 2-4am on a regular basis, and that is me just trying to keep my job. I do my job as expected of me, no higher, no wayang. I dont bother being high performer due to the attention as well as to stay below radar. so to those who talk about quiet quitting, i'm not sure how u do it.
im quite certain those who talk about quiet quitting are either only associate level or not from a big 4